Paris Meadows Subdivision

This vibrant community hub, spanning 57.5 hectares, includes 309 residential lots and 14 commercial/industrial blocks, providing homes for around 1,000 residents. The land was developed into eight streets, with the addition of a new pumping station and a 6-cell stormwater management pond. Featuring a wide range of Coldstream Concrete’s standard products, we successfully installed 3.5 kilometers of reinforced concrete pipe ranging from 300mm to 1800mm in diameter, multiple outlet headwalls, and over 350 round and square precast structures.

Products used: RCP, headwalls, structures.

  • Precast concrete pipes on a dirt field.

  • A construction site with concrete pipes in the ground and an excavator in the background.

  • A precast concrete headwall culvert.

  • 2 rows of precast concrete pipes sitting in the dirt on a construction site.

The Myers drain and pump works job site. Showing the concrete build and crane in the background.
November 5, 2026
The Myers Drain and Pump Works project was undertaken to improve drainage capacity and water management across the Myers Drain watershed in Chatham-Kent.
A birds-eye-view of upgrades being done on the East Marsh Piping station.
August 31, 2026
Coldstream Concrete partnered with the City of Windsor to upgrade the existing East Marsh pumping stations. Read here to find out all about the upgrades.
A wide shot of culverts being installed under a road.
July 10, 2026
Read about Coldstream Concrete's involvement in the Bradley Avenue Extension, where the company installed a large precast open-bottom culvert system.