Myers Drain and Pump Works: Custom Precast Chambers for Chatham-Kent Drainage

The Myers Drain and Pump Works project was undertaken to improve drainage capacity and water management across the Myers Drain watershed in Chatham-Kent. Coldstream Concrete supplied two custom precast concrete chambers that form the core of the project’s new dual-pump station, supporting long-term flood mitigation for the area and reliable system performance.

What do the Myers Drain and Pump Works include?

The Myers drain and pump worksite, partially built with a large concrete piece suspended in the air.

The project strengthens drainage and flood control in the watershed through several coordinated improvements:

  • New dual-pump station: moves water reliably out of the drainage system during high-flow events
  • Drainage channel improvements
  • Culvert installations: keep water moving efficiently through the system
  • Associated piping infrastructure: ties the station and drain works together

What did the precast design consist of?

Coldstream Concrete supplied two custom precast chambers, each approximately 7.6 m long × 3.8 m wide × 6.3 m tall. Each chamber was manufactured in six precast sections, and the two were installed side by side as a key component of the pumping station.

Designing for open inlets

Two riser sections in each chamber were designed with one open side to accommodate the inlet openings, where a trash rack would be installed to intercept debris before it enters the system. To keep the flow openings clear while maintaining structural strength, precast concrete beams were cast in place of wall panels. These beam-supported risers were the heaviest pieces of the project, weighing approximately 72,000 lb (about 32.7 tonnes) each, a clear measure of the scale and complexity of the precast solution.

Why precast concrete?

The Myers Drain and Pump Works construction site, with an excavator in focus.

Manufacturing the chambers in a controlled plant environment delivered a durable, high-quality structure and simplified work on site:

  • Consistent quality, with curing protected from weather
  • Production runs alongside site preparation instead of waiting on it
  • Off-site production results in efficient on-site installation

Supporting Chatham-Kent’s drainage for the long term

Coldstream Concrete is proud to provide critical infrastructure that helps protect Chatham-Kent properties and farmland from flooding. Browse our other precast concrete infrastructure projects to see more of our work across Southwestern Ontario, or contact us today. Learn more about chambers here.


A birds-eye-view of upgrades being done on the East Marsh Piping station.
August 31, 2026
Coldstream Concrete partnered with the City of Windsor to upgrade the existing East Marsh pumping stations. Read here to find out all about the upgrades.
A wide shot of culverts being installed under a road.
July 10, 2026
Read about Coldstream Concrete's involvement in the Bradley Avenue Extension, where the company installed a large precast open-bottom culvert system.
A construction site with a crane lowering a precast concrete box culvert.
April 14, 2025
The removal and replacement of the Irwin drain culvert was successfully completed in November 2024 by Jones Group Inc. at the intersection of County Road 31 and County Road 8. Coldstream Concrete Ltd. was hired to manufacture and deliver 23.2 meters of a 5.0m x 2.8m box culvert. The precast concrete culvert was designed with custom features, including skewed ends, recessed connection plates, approach slab seats, and integrated infill sections, all cast directly into the culvert units. The entire culvert installation was efficiently completed in a single day. Products used: box culverts.
More Projects

Drain Tile

Storm and Sanitary

Engineered Precast