<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:atom="http://www.w3.org/2005/Atom" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:g-custom="http://base.google.com/cns/1.0" xmlns:media="http://search.yahoo.com/mrss/" version="2.0">
  <channel>
    <title>coldstream-concrete</title>
    <link>https://coldstreamconcrete.com</link>
    <description />
    <atom:link href="https://coldstreamconcrete.com/feed/rss2" type="application/rss+xml" rel="self" />
    <item>
      <title>Bradley Avenue Extension</title>
      <link>https://coldstreamconcrete.com/bradley-avenue-extension</link>
      <description>Read about Coldstream Concrete's involvement in the Bradley Avenue Extension in, where the company installed a large precast open-bottom culvert system.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Last year Coldstream Concrete had the honour of joining The Bradley Avenue Extension as well as The Bradley Avenue Extension &amp;amp; White Oak Tributary Complete Corridor projects in London, Ontario. As part of this
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           London, Ontario road construction
          &#xD;
    &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            initiative, these projects were designed with the purpose of increasing the number of driving lanes, supporting future development in the area, creating a heavily upgraded and naturalized drainage channel to manage stormwater, and improving overall landscaping and sidewalks. 
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           How did Coldstream Concrete Contribute?
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
      
           The Bradley Avenue Extension &amp;amp; White Oak Tributary Complete Corridor project in London, Ontario is a major infrastructure improvement spanning from Wharncliffe Road South to Jalna Boulevard. The project includes several complex structural elements, highlighted by a large precast open-bottom culvert system constructed in two stages. This project marks a significant milestone for Coldstream Concrete, as it represents the largest span culvert ever manufactured by the company and one of the largest precast culvert systems ever constructed in the region. The installation featured two
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           41.4 m
          &#xD;
    &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            runs of precast footings, and at the heart of the project, a
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           40.8 m
          &#xD;
    &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            long open-bottom culvert with an impressive
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           16.2 m
          &#xD;
    &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            span and
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           2.413 m rise
          &#xD;
    &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            , made up of
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           36
          &#xD;
    &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            precast units weighing
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           42.7 tonnes each
          &#xD;
    &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      
           . The south half of the culvert system was successfully installed in Fall 2025, followed by the north half in Spring 2026.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            ﻿
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Why was Coldstream Concrete &amp;amp; Precast Concrete Chosen?
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Coldstream Concrete's specialization in
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           precast concrete
          &#xD;
    &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      
           made the company an ideal fit for this project. Because precast units are manufactured off-site at Coldstream's own facility rather than cast on location, the Bradley Avenue job site required less space for formwork and staging. Installation time was significantly reduced compared to a cast-in-place approach.
           &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Ongoing Development
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
      
           While Coldstream Concrete's involvement in the precast culvert production &amp;amp; installation phase has been completed, both the Bradley Avenue Extension and the Bradley Avenue Extension &amp;amp; White Oak Tributary Complete Corridor projects are set to continue development as part of London's broader infrastructure plan.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="https://getinvolved.london.ca/white-oaks-tributary-complete-corridor" target="_blank"&gt;&#xD;
      &lt;br/&gt;&#xD;
      &lt;br/&gt;&#xD;
      
           Click here for more information on The White Oaks Tributary Complete Corridor
          &#xD;
    &lt;/a&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            ,
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="https://getinvolved.london.ca/bradley-ave" target="_blank"&gt;&#xD;
      
           here for The Bradley Avenue Extension
          &#xD;
    &lt;/a&gt;&#xD;
    &lt;span&gt;&#xD;
      
           ,
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="https://coldstreamconcrete.com/precast-blog" target="_blank"&gt;&#xD;
      
           or here
          &#xD;
    &lt;/a&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            if you're interested in Coldstream Concrete’s other highlighted projects.
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/3f0b7611/dms3rep/multi/IMG_1588.jpeg" length="648138" type="image/jpeg" />
      <pubDate>Fri, 10 Jul 2026 20:01:34 GMT</pubDate>
      <guid>https://coldstreamconcrete.com/bradley-avenue-extension</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/3f0b7611/dms3rep/multi/IMG_1596.jpeg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/3f0b7611/dms3rep/multi/IMG_1588.jpeg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>County Road 31 Culvert</title>
      <link>https://coldstreamconcrete.com/county-road-31-culvert</link>
      <description />
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           The removal and replacement of the Irwin drain culvert was successfully completed in November 2024 by Jones Group Inc. at the intersection of County Road 31 and County Road 8. Coldstream Concrete Ltd. was hired to manufacture and deliver 23.2 meters of a 5.0m x 2.8m box culvert. The precast concrete culvert was designed with custom features, including skewed ends, recessed connection plates, approach slab seats, and integrated infill sections, all cast directly into the culvert units. The entire culvert installation was efficiently completed in a single day.
           &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/3f0b7611/dms3rep/multi/County+Road+31+1.jpg" alt="A construction site with a crane lifting a concrete box."/&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/3f0b7611/dms3rep/multi/County+Road+31+1.jpg" length="80367" type="image/jpeg" />
      <pubDate>Mon, 14 Apr 2025 17:39:15 GMT</pubDate>
      <guid>https://coldstreamconcrete.com/county-road-31-culvert</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/3f0b7611/dms3rep/multi/County+Road+31+1.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/3f0b7611/dms3rep/multi/County+Road+31+1.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Paris Meadows Subdivision</title>
      <link>https://coldstreamconcrete.com/paris-meadows-subdivision</link>
      <description />
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           This vibrant community hub, spanning 57.5 hectares, includes 309 residential lots and 14 commercial/industrial blocks, providing homes for around 1,000 residents.
          &#xD;
    &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            The land was developed into eight streets, with the addition of a new pumping station and a 6-cell stormwater management pond. Featuring a wide range of Coldstream Concrete’s standard products, we successfully installed 3.5 kilometers of reinforced concrete pipe ranging from 300mm to 1800mm in diameter, multiple outlet headwalls, and over 350 round and square precast structures.
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/3f0b7611/dms3rep/multi/Paris+2.jpg" length="577496" type="image/jpeg" />
      <pubDate>Mon, 14 Apr 2025 17:37:23 GMT</pubDate>
      <guid>https://coldstreamconcrete.com/paris-meadows-subdivision</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/3f0b7611/dms3rep/multi/Paris+2.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/3f0b7611/dms3rep/multi/Paris+2.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Western University Steam Tunnel</title>
      <link>https://coldstreamconcrete.com/western-university-steam-tunnel</link>
      <description />
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           This multi-year project, which began in 2023, is now entering its third year of construction.
          &#xD;
    &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            The project is being completed in phases with the assistance of London-based installation contractors. Every effort has been made to minimize any disruptions to students studying on campus. Phase 1 involved the installation of 64 meters of 1.5m x 0.9m steam tunnel with removable concrete lids. Phase 2 is currently in progress and, once finished, will extend the tunnel by an additional 130 meters, including the addition of a new hub to direct steam in four directions. To date, Coldstream Concrete Ltd. has produced 79 tunnel segments and 68 lids.
            &#xD;
        &lt;br/&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/3f0b7611/dms3rep/multi/Western+4.jpg" length="928520" type="image/jpeg" />
      <pubDate>Mon, 14 Apr 2025 17:33:02 GMT</pubDate>
      <guid>https://coldstreamconcrete.com/western-university-steam-tunnel</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/3f0b7611/dms3rep/multi/Western+4.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/3f0b7611/dms3rep/multi/Western+4.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
  </channel>
</rss>
