Bradley Creek

Bradley Creek

Aylmer, Ontario

Project scope

On November 3, 2016, Coldstream Concrete Ltd. supplied the second half of this three-sided open-bottom culvert to the town of Aylmer, Ontario. The culvert spans 6.0 metres wide and is a low earth cover design. Due to existing hydro conduits three of the culvert pieces had to be “skated” into position after they were lowered into the excavation.

Continue Reading

Mollard Line

Mollard Line

South Huron, Ontario

Project scope

On March 7th Coldstream Concrete Ltd. supplied a fourteen-piece “ALL SKEW” precast concrete box culvert to Cope Construction in South Huron, Ontario. The culvert spans 5.6m, sits 3.35m tall and is 21.5m long. Each piece was built in our custom formwork with a 30-degree skew and weighed in at 24,255 kg. Installation took less than one day. The culvert end treatments are comprised of 128 precast concrete retaining wall blocks.

Continue Reading

Sewer Upgrades & Road Widening | Fanshawe Park Road

Fanshawe Park Road

London

Project scope

In November of 2017, Land Development Solutions (LDS) presented a project that required a large 3.0m diameter maintenance hole to be put in one of the busiest commuter routes into the City of London. The project was finally awarded to CH Excavating (2013) in the Spring of 2019. In May 2019, Fanshawe Park Road West was closed in London, ON for approximately two weeks to allow for sewer upgrades, road widening and the connection of new services to a new proposed gas station just west of Hyde Park Road.

Continue Reading

William Street | Exeter, Ontario

William St. Pump Station

Exeter

Project scope

Stone Town Construction and Coldstream Concrete Ltd. teamed up on October 15th, 2019 to install a 6.2m wide by 5.3m long superload chamber in the town of Exeter. This 9-piece custom precast structure features an internal wall and platform and can be viewed directly off of Highway #4.

Continue Reading

Little John Road | Chatham-Kent

Little John Road

Chatham-Kent

Project scope

On November 19th Coldstream Concrete Ltd. supplied Clarke Construction with a 10-piece precast box culvert. The 3.0m x 2.7m x 20.0m long culvert was installed on Little John Road in Chatham-Kent. Total install time for the box was 6 hours.

Continue Reading

Colonel Talbot Pump Station

Colonel Talbot Pump Station

London, Ontario

Project scope

On January 21st and 22nd, Coldstream Concrete Ltd. supplied an eight-piece, custom precast concrete pump chamber to R. Russell Construction just south of Southdale Rd. in London, Ontario.

Continue Reading

Oily & Storm Water Sump Pit | Sarnia, ON

Oily & Storm Water Sump Pit

Sarnia, Ontario

Project scope

Curran Contractors installed this 8-piece chamber with a seperate lid to extend over 4 middle sections of the chamber. The three-sided pieces were built with an open top and went to a chemical refinery near Sarnia.

Continue Reading

Foxwood Subdivision, London, ON

Foxwood Subdivision

London

Project scope

Project Foxwood Subdivision Phase 3 in London’s Northwest corner. There are 27 pieces of box culvert waiting to be installed along with a large box manhole to go in the middle of the sewer and over 250 meters of 1200mm Reinforced Concrete Sewer Pipe still to be laid in the ground.

Continue Reading